Industries/Data centres & AI compute
Data centre, colocation & AI compute
On most of these builds the transformer, not the construction, sets the energisation date. Eight months against a 2.5 to 4 year domestic quote is the entire reason to talk to us.
Procurement reality
How this segment buys
- Capital is usually private and unrestricted, which generally leaves imported equipment eligible.
- The schedule is the commercial driver — every month of delay to energisation is a month of deferred revenue on the hall.
- Purchase is often placed by the developer, or by the EPC on the developer’s behalf, against the utility’s interconnection requirements.
- Buyers want a delivered price they can compare against a domestic delivered price without unpicking freight and duty.
What we bring to it
Where we fit
- Approximately 8 months from order release, with a dated schedule rather than a hopeful one.
- DDP to site quotable, so freight, insurance, customs entry and duty are inside the number and tariff risk sits with us between quotation and delivery.
- Routine tests per IEEE C57.12.90 on every unit, with certificates per serial number for the commissioning pack.
- Witnessed factory acceptance testing, which lets you take schedule risk out before the unit ships.
Before you evaluate us
What to settle first
Confirm the interconnection and utility acceptance requirements early — where the serving utility imposes its own standard specification on the transformer, we will respond to it clause by clause. If any part of the project draws on federal funding, check domestic-content conditions first.
Our units are of foreign manufacture and do not qualify as domestic end products. The eligibility checker on the Trade & Compliance page answers this in three questions.
Specification
What we supply into this segment
| Rating range | Up to 50 MVA. Core commercial focus is the 12–50 MVA class. |
|---|---|
| Design standards | IEEE C57.12.00 and IEEE C57.12.10 |
| Routine testing | IEEE C57.12.90 on every unit; certificates issued per serial number |
| Factory acceptance | Witnessed by an independent third-party inspection agency; your inspector welcome |
| Loss performance | Guaranteed no-load and load loss values, with liquidated-damages backing |
| Lead time | Approximately 8 months from order release |
| Delivery | DDP to site quotable |
| Domestic content | Foreign manufacture — does not qualify as a domestic end product |
Other segments
Also supplied
Send your energisation date
Enquiries go directly to the Chief Executive Officer. If your requirement is outside what we supply, you will be told that plainly.