AxionOrbital Space Inc · Delaware C corporation · NAICS 335311 +1 415-212-3061 · dhenenjay@axionorbital.space
AxionOrbitalTransformer Supply

Quality & Testing

Every unit routine tested, every certificate serialised

Testing is where an import supplier either earns a utility engineer's confidence or loses it. Our position is straightforward: routine tests per IEEE C57.12.90 on every unit, factory acceptance testing witnessed by an independent third-party inspection agency, and documentation tied to serial numbers rather than to the order as a whole.

100% of units

Routine tested per IEEE C57.12.90 — not a sample, not a type test standing in for the unit you are buying.

Independent witness

Third-party inspection agency attends factory acceptance testing as standard scope, not as a chargeable extra.

Per serial number

Certificates are issued against each unit's serial number, so incoming inspection and asset records close out cleanly.

Interactive

Routine, type and special tests

These terms are often used loosely in supplier correspondence. We use them as IEEE C57.12.90 defines them, and the quotation states explicitly which tests are included.

Performed on every individual unit

Routine tests apply to each transformer as built. They are the evidence that the specific unit shipping to your site meets its guaranteed values.

Included on every unit as standard, with certificates issued per serial number.

The applicable set for a given unit depends on its rating, voltage class and the governing specification, and is confirmed in the quotation.

Electrical characteristics

  • Winding resistance measurement
  • Turns ratio
  • Polarity and phase relation
  • No-load loss and excitation current
  • Load loss and impedance voltage

Dielectric & integrity

  • Applied-voltage test
  • Induced-voltage test
  • Insulation power factor / resistance, as specified
  • Insulating liquid quality
  • Leak and pressure testing of the tank

Witness testing

Independent witnessing as standard, plus your own inspector

Third-party inspection agency

Factory acceptance testing is witnessed by an independent third-party inspection agency as part of our standard scope, not as a chargeable extra. The agency's report accompanies the test certificates.

Customer or appointed witness

You are welcome to attend, or to appoint your own inspection agency to attend on your behalf. We will schedule testing to accommodate attendance and provide reasonable notice of the test date.

We offer this without being asked because, for a first order from a new supplier, it is usually the most useful assurance available — and it costs us nothing to extend.

Order to delivery

Where testing sits in the sequence

The documentation schedule and test plan are agreed and dated at order placement, so submittal dates are contractual rather than informal. Nothing about testing is left to be negotiated once the unit is already built.

How loss guarantees are evaluated

Order release

Test plan, documentation schedule and witness arrangements agreed and dated.

Manufacture

Built to IEEE C57.12.00 and C57.12.10 against the agreed specification.

Routine tests

Full routine sequence per IEEE C57.12.90 on the individual unit.

Witnessed factory acceptance

Independent third-party agency attends; you or your appointed inspector may attend.

Documentation issued

Certificates per serial number, plus the third-party inspection report.

Delivery

DDP to site quotable, documentation accompanying the unit.

Guarantees

Loss guarantees and liquidated damages

No-load and load loss values are guaranteed in the quotation and backed by liquidated-damages language, measured against the routine test results for the specific unit.

This is what makes the figures usable in a loss-evaluated bid: they are contractual values verified by a test on the transformer you are buying, not design estimates carried across from another unit.

Documentation

Issued with each unit

Supplied as standard:

  • Routine test certificates per IEEE C57.12.90, issued against each serial number
  • Independent third-party inspection report covering factory acceptance testing
  • Guaranteed loss values as quoted, stated alongside the measured test results

Drawing and manual deliverables — outline and general arrangement drawings, nameplate drawing, wiring diagrams, installation and maintenance documentation, and any submittal schedule your specification requires — are confirmed as a documentation schedule at order placement.

Certifications

Manufacturing quality certifications are held by the manufacturing facility, not by AxionOrbital Space Inc. We do not present factory certifications as our own.

Where a purchaser requires evidence of the facility's quality system, we will obtain and provide the current certificate as part of the bid response.

Have a standard specification to check against?

Send it with your enquiry. You will get a clause-by-clause compliance response with exceptions listed explicitly.

Request a quotation Call