Third-party inspection agency
Factory acceptance testing is witnessed by an independent third-party inspection agency as part of our standard scope, not as a chargeable extra. The agency's report accompanies the test certificates.
Quality & Testing
Testing is where an import supplier either earns a utility engineer's confidence or loses it. Our position is straightforward: routine tests per IEEE C57.12.90 on every unit, factory acceptance testing witnessed by an independent third-party inspection agency, and documentation tied to serial numbers rather than to the order as a whole.
Routine tested per IEEE C57.12.90 — not a sample, not a type test standing in for the unit you are buying.
Third-party inspection agency attends factory acceptance testing as standard scope, not as a chargeable extra.
Certificates are issued against each unit's serial number, so incoming inspection and asset records close out cleanly.
Interactive
These terms are often used loosely in supplier correspondence. We use them as IEEE C57.12.90 defines them, and the quotation states explicitly which tests are included.
Routine tests apply to each transformer as built. They are the evidence that the specific unit shipping to your site meets its guaranteed values.
Included on every unit as standard, with certificates issued per serial number.
The applicable set for a given unit depends on its rating, voltage class and the governing specification, and is confirmed in the quotation.
Type tests characterise a design. A type test certificate demonstrates that a design was proven — it says nothing about the individual transformer arriving at your site.
Available on request. Identified and priced separately in the quotation so the scope is unambiguous.
If a supplier offers you a single "test report" without saying whether it is a routine test of your unit or a type test of the design, ask which. It is the most common ambiguity in transformer bid documentation, and the difference matters.
Special tests are those your specification calls for beyond the routine and type sequences. They are quoted individually rather than assumed.
Available on request. Identified and priced separately in the quotation.
Where your standard specification names a test by a different name, or adds one, we confirm it clause by clause at quotation rather than assuming equivalence. You get an explicit list of exceptions, not a blanket conformity claim.
Witness testing
Factory acceptance testing is witnessed by an independent third-party inspection agency as part of our standard scope, not as a chargeable extra. The agency's report accompanies the test certificates.
You are welcome to attend, or to appoint your own inspection agency to attend on your behalf. We will schedule testing to accommodate attendance and provide reasonable notice of the test date.
We offer this without being asked because, for a first order from a new supplier, it is usually the most useful assurance available — and it costs us nothing to extend.
Order to delivery
The documentation schedule and test plan are agreed and dated at order placement, so submittal dates are contractual rather than informal. Nothing about testing is left to be negotiated once the unit is already built.
Test plan, documentation schedule and witness arrangements agreed and dated.
Built to IEEE C57.12.00 and C57.12.10 against the agreed specification.
Full routine sequence per IEEE C57.12.90 on the individual unit.
Independent third-party agency attends; you or your appointed inspector may attend.
Certificates per serial number, plus the third-party inspection report.
DDP to site quotable, documentation accompanying the unit.
Guarantees
No-load and load loss values are guaranteed in the quotation and backed by liquidated-damages language, measured against the routine test results for the specific unit.
This is what makes the figures usable in a loss-evaluated bid: they are contractual values verified by a test on the transformer you are buying, not design estimates carried across from another unit.
Documentation
Supplied as standard:
Drawing and manual deliverables — outline and general arrangement drawings, nameplate drawing, wiring diagrams, installation and maintenance documentation, and any submittal schedule your specification requires — are confirmed as a documentation schedule at order placement.
Manufacturing quality certifications are held by the manufacturing facility, not by AxionOrbital Space Inc. We do not present factory certifications as our own.
Where a purchaser requires evidence of the facility's quality system, we will obtain and provide the current certificate as part of the bid response.
Send it with your enquiry. You will get a clause-by-clause compliance response with exceptions listed explicitly.