AxionOrbital Space Inc · Delaware C corporation · NAICS 335311 +1 415-212-3061 · dhenenjay@axionorbital.space
AxionOrbitalTransformer Supply

Industries/Campus & healthcare

Universities, hospitals & campus utilities

Campus and healthcare utilities are usually carrying replacements they have already deferred once. A 2.5 to 4 year lead time is what makes deferring them again the default.

Procurement reality

How this segment buys

  • Central plant and campus distribution assets, frequently maintained by a small in-house utilities team.
  • Replacements compete against academic or clinical capital priorities, so the business case has to be defensible on total cost.
  • Continuity requirements are severe in healthcare — a planned changeover has to be genuinely planned.
  • Funding can be institutional, bond-financed, or in some cases state or federally supported, which changes eligibility.

What we bring to it

Where we fit

  • Approximately 8 months from order release, short enough that a replacement can actually be scheduled rather than deferred.
  • Guaranteed loss values, which strengthens a total-cost business case against a lower first-cost option.
  • Documentation per serial number for estates and compliance records.
  • Witnessed factory acceptance testing, which matters where an unplanned outage is clinically unacceptable.

Before you evaluate us

What to settle first

Check the funding source carefully. Institutional or bond-financed purchases are generally unrestricted, but state-funded or federally supported work may carry domestic-content rules, and our units do not qualify as domestic end products.

Our units are of foreign manufacture and do not qualify as domestic end products. The eligibility checker on the Trade & Compliance page answers this in three questions.

Specification

What we supply into this segment

New-manufacture liquid-immersed power and distribution transformers
Rating rangeUp to 50 MVA. Core commercial focus is the 12–50 MVA class.
Design standardsIEEE C57.12.00 and IEEE C57.12.10
Routine testingIEEE C57.12.90 on every unit; certificates issued per serial number
Factory acceptanceWitnessed by an independent third-party inspection agency; your inspector welcome
Loss performanceGuaranteed no-load and load loss values, with liquidated-damages backing
Lead timeApproximately 8 months from order release
DeliveryDDP to site quotable
Domestic contentForeign manufacture — does not qualify as a domestic end product

Full product detail and the loss-evaluation calculator

Other segments

Also supplied

01

Municipal utilities & public power

Open

02

Electric cooperatives & G&T co-ops

Open

03

Data centre, colocation & AI compute

Open

All eight segments

Send your replacement plan

Enquiries go directly to the Chief Executive Officer. If your requirement is outside what we supply, you will be told that plainly.

Request a quotation Call